BRAHMANBARIA, Jan 5: Production at the Zia fertiliser factory in Ashuganj has been suspended for a fault developed in the cooling tower. The fault developed Wednesday causing suspension of the production at the urea fertiliser factory. Engineers at the factory could not tell for sure when the fault would be repaired so that production could be resumed. — BDNEWS
|